York Travel Shelter

Train Station
Waiting Shelters

York - Waiting Shelters

The Input Group were appointed to design, manufacture and install a fully enclosed waiting room at York Station. We undertook all electrical connections and groundworks including drainage and block paviour finish. 

What was asked

The job required the generation of AutoCad details of the existing and proposed platform infrastructure. Responsibility was taken for the generation of utility services and communication of hardware schematics. 

The site set-up included the installation and commissioning of a temporary waiting facility and site office. This element was completed in 24 hours to ensure continuity of service.

How We Did It

The York Station building and infrastructure were examined, ensuring utilities and groundworks were safe for the new shelter unit to be installed.

Throughout the whole design and construction phase of the project the Input Group were always on hand to provide answers and solutions to ensure the project  schedule was maintained.

  • Appointed to design, manufacture and install a fully enclosed waiting room at York Station
  • The Input Group were always on hand to provide answers and solutions to ensure the project  schedule was maintained
  • Quote 3 Quote 3 Quote 3

  • Quote 4 Quote 4 Quote 4

To find out more about our Work Contact Us